About us

More than 30 years of experience in utility infrastructure

DniproRemont provides construction, reconstruction, rehabilitation, cleaning and inspection services for pipelines and underground utilities. We combine practical experience, modern technology and responsible planning to develop solutions for the actual conditions of each site.

About us

Engineering solutions built on experience

DniproRemont specialises in external utility infrastructure. The company uses open-cut and trenchless methods for pipeline installation and rehabilitation and provides cleaning, CCTV inspection, utility locating and construction dewatering services.

More than 30 years of practical experience help the team assess site conditions, anticipate technical constraints and select solutions according to the client’s requirements. Every project requires an individual assessment, so the method, scope and sequence of work are determined after the available data have been reviewed.

Why clients trust us
30+
years of practical experience
Open-cut & trenchless
methods — technology to suit site conditions
Integrated approach
from inspection to project execution
Digital documentation
for inspections and selected services
Our mission

Reliable infrastructure is the basis of a safe environment

Our mission is to construct, reconstruct and rehabilitate utility networks using modern technologies and materials, creating reliable solutions for each client’s specific requirements.

We work to make the infrastructure that supports everyday life safer, more efficient and more durable. For us, quality is not limited to the completed work: it also means responsible preparation, clear communication and control throughout every project stage.

Reliable infrastructure Safer conditions Long-term performance
How we work

Our project approach

We do not apply the same solution to every site. Before work begins, the team reviews the available data, network condition, site characteristics, utility access and project constraints — this lets us select a technically appropriate method and agree on a clear sequence of work.

  1. 01

    We assess the requirements

    We review the available data, network condition, site constraints and required outcome.

  2. 02

    We select the method

    We compare the available options and identify a solution suited to the technical conditions of the site.

  3. 03

    We plan the work

    We define the stages, resources, access requirements, safety measures and communication process.

  4. 04

    We deliver the project

    We assign the appropriate specialists and equipment and monitor the key stages of the work.

  5. 05

    We verify the result

    We document the completed work and provide the agreed project materials to the client.

Values

Values that guide our work

01

Professionalism

We rely on practical experience, technical knowledge and responsible preparation for every project.

02

Client partnership

We maintain communication at key stages, explain the proposed solutions and follow the agreed requirements.

03

Accountability for results

We plan the work around actual site conditions and monitor delivery of the agreed scope.

04

Continuous improvement

We follow technological developments, refine our working methods and strengthen the team.

05

Long-term approach

We value stable relationships, well-founded decisions and growth that does not compromise quality.

Responsibility

Responsibility in every decision

For us, corporate responsibility means professional conduct, respect for people, safe organisation of work, responsible use of resources and honest relationships with clients, employees and partners.

Worksite safety

We consider project risks during planning and execution, organise the work area and follow safety requirements.

Quality and control

Quality is supported by preparation, appropriate method selection, qualified specialists and control of key stages.

Responsible use of resources

We aim to limit unnecessary site disturbance, select appropriate methods and use resources responsibly.

Integrity and respect

We build relationships through open communication, respect for commitments and responsible handling of information.

DniproRemont in numbers
30
years on the market
2 000+
completed projects
1 400
mm — max. diameter
8
regions of presence
// Portfolio

Our major projects

The largest projects delivered between 2013 and 2025. Click a row to open the project details — method, scope and key figures.

Collector Ø1400 + Ø900 (Donetske Hwy) ГШБ Ø1400 мм · ГНБ Ø900 мм Auger boring + HDD 2025

About

Two trenchless technologies were combined on a single project: the large Ø1400 mm section was completed by auger boring, and the Ø900 mm section by horizontal directional drilling.

Selecting the method per section makes it possible to route the collector under Donetske Highway optimally, accounting for diameters, soils and workspace — without large-scale road excavation.

Scope of work

  • Laying Ø1400 mm steel pipe, 81 m long, by auger boring
  • Laying Ø900 mm pipe, 72 m long, by HDD
  • Storm collector repair under an arterial road
Discharge pipe Ø1400 (146 m) ГШБ · сталь Ø1400 мм Auger boring 2025

About

A large-diameter discharge pipe was rehabilitated with a Ø1400 mm steel pipe by auger boring — one of the longest bores of this diameter in the company’s portfolio (146 m).

The works were carried out in high-groundwater conditions; manholes and chambers were built at 4–5 m depth. The trenchless method made it possible to route the line without large-scale surface excavation.

Scope of work

  • Laying Ø1400 mm steel pipe, 146 m long, by auger boring
  • Work in high-groundwater conditions
  • Installation of manholes and chambers at 4–5 m depth
Culverts (SPIRO) СПІРО Ø1200/Ø800 · гідроочистка Ø1000 Combined works 2025

About

The project combines several types of work: laying large-diameter spiral-wound SPIRO pipe (Ø1200 and Ø800 mm) and restoring the capacity of existing Ø1000 mm pipelines.

Before commissioning, hydrodynamic and mechanical cleaning was carried out; manholes and chambers were built at 5 m depth in water-saturated soils. This combined approach restores the culverts as a single system.

Scope of work

  • Laying SPIRO pipe Ø1200 mm — 38 m and Ø800 mm — 24 m
  • Hydrodynamic and mechanical cleaning of existing Ø1000 mm pipelines
  • Installation of manholes and chambers at 5 m depth
Ø1800 storm collector (SICH) Ø1800 мм · 492 пог. м Large diameter 2024

About

One of the company’s largest projects by diameter: a Ø1800 mm storm collector forming the trunk stormwater outfall for an entire district on Naberezhna Peremohy.

The key challenge was a high groundwater level along the whole route. The works were supported by dewatering of the work area to keep excavations stable and to lay the pipe and build the manholes at the design levels.

Scope of work

  • Laying Ø1800 mm polyethylene pipe, 492 m in total
  • Work in high-groundwater conditions with dewatering
  • Installation of inspection manholes at up to 5 m depth
Auger boring Ø1400 (Donetske Hwy) ГШБ · сталь Ø1400 мм Auger boring 2024

About

A Ø1400 mm steel casing was installed by auger boring — without opening the carriageway of Donetske Highway and without stopping traffic.

The works were carried out in high-groundwater conditions; manholes and chambers were built at 4–5 m depth. Auger boring keeps the bore precisely on the design axis under a major road at a large diameter.

Scope of work

  • Laying Ø1400 mm steel pipe, 120 m long, by auger boring
  • Work in high-groundwater conditions
  • Installation of manholes and chambers at 4–5 m depth
Storm sewer Ø1000 (Yaruzhna) ГШБ · Ø1000 мм Auger boring 2024

About

A Ø1000 mm storm collector was installed by auger boring without opening the surface. Manholes were built at a considerable depth of 5–6 m.

The challenge was a high groundwater level; the works were supported by dewatering to keep excavations stable and to install the manholes at the design levels.

Scope of work

  • Laying Ø1000 mm pipe, 124 m long, by auger boring
  • Work in high-moisture soil conditions
  • Installation of manholes at 5–6 m depth
Drainage outfalls in the Dnipro ЗБ Ø1000 мм · 183 пог. м Hydraulic engineering 2021

About

A technically demanding project: the repair of drainage outfalls was carried out directly in the Dnipro riverbed. Such conditions require a dedicated work-zone setup, water control and structural stability.

In addition to laying Ø1000 mm reinforced-concrete pipe, retaining walls, outlet portals and chambers were built at up to 5 m depth — permanent hydraulic structures that ensure reliable drainage discharge.

Scope of work

  • Laying Ø1000 mm reinforced-concrete pipe, 183 m long
  • Construction of retaining walls, outlet portals and chambers
  • Works in the Dnipro riverbed at up to 5 m depth
Utility relocation (HDD Ø710) ГНБ · Ø710 мм HDD 2021

About

Before construction of the residential building, the existing networks had to be relocated from the building footprint. All pipelines were re-laid by horizontal directional drilling.

The trenchless approach made it possible to relocate the storm (Ø710 and Ø450 mm) and foul (Ø315 mm) sewers without large-scale excavation in the tight site conditions.

Scope of work

  • Storm sewer by HDD: Ø710 — 83 m, Ø450 — 22 m
  • Foul sewer by HDD: Ø315 — 42 m
  • Clearing the footprint for a residential building
Utilities near metro (HDD Ø800) ГНБ · Ø800 мм HDD 2018–2020

About

The project was part of metro construction, commissioned by the representative office of the Turkish company Limak. Utilities were relocated from the construction footprint without disrupting the urban environment.

All networks were installed by horizontal directional drilling, with part of the storm sewer at a considerable depth of 6–8.5 m. The trenchless approach allowed passing through a dense urban node near the metro station without large-scale surface excavation.

Scope of work

  • Storm sewer by HDD: Ø800 — 259 m, Ø400 — 190 m at 6–8.5 m depth
  • Foul sewer by HDD: Ø400 — 227 m, Ø315 — 59 m at 5 m depth
  • Work in a dense urban node near the metro station
Complex gas supply (HDD Ø280) ГНБ · ПЕ Ø280 мм HDD 2016

About

Gas supply for the multifunctional complex was provided by laying a Ø280 mm polyethylene pipe, 364 m long, by horizontal directional drilling, commissioned by Dniprogaz PJSC.

The trenchless method allowed gas to be brought into a densely built-up area without opening the surface and in line with the requirements for gas networks.

Scope of work

  • Laying Ø280 mm polyethylene pipe, 364 m long, by HDD
  • Bringing gas into a densely built-up area
  • Compliance with gas-network requirements
Sports complex network reconstruction ГСБ · 354 м · санація Ø110 · 688 м Complex reconstruction 2015

About

A combined project with reconstruction of a pumping station and networks totalling 354 m. Several technologies were used: relining of existing pipelines with Ø110 mm PE pipe (688 m) and laying Ø159 mm steel pipe (353 m) by HDD.

Selecting the method per section allowed the sports complex’s utilities to be renewed with minimal site disturbance.

Scope of work

  • Reconstruction of networks and a pumping station, 354 m (auger boring)
  • Relining existing pipelines with Ø110 mm PE pipe — 688 m
  • Laying Ø159 mm steel pipe — 353 m by HDD
Sewer + water (HDD + relining) ГНБ Ø315 мм · санація Ø600→355 HDD + relining 2014

About

The project combines new construction and rehabilitation: a section was installed by HDD with a Ø315 mm polyethylene pipe, while the existing Ø600 mm water collector was rehabilitated by relining — pulling in a Ø355 mm PE pipe, 530 m long.

Relining made it possible to renew the network within the existing route without full replacement or major earthworks, preserving the surface.

Scope of work

  • Laying Ø315 mm PE pipe — 108 m by HDD
  • Relining the Ø600 mm water collector with a Ø355 mm PE pipe — 530 m
  • Combining new construction and network rehabilitation
Gas main relining Ø500, 1137 m Ø500 мм · 1137 пог. м Relining 2013

About

A high-pressure gas main sets elevated requirements for the quality and reliability of rehabilitation. Instead of open-cut replacement, trenchless relining was used — a continuous Primus Line polymer liner pulled in over the full 1137 m length.

Before pull-in, a full internal-surface preparation cycle was carried out: mechanical and hydrodynamic cleaning, milling and CCTV inspection. This ensured a correct liner fit and a durable rehabilitated section without opening the street.

Scope of work

  • Pull-in of a continuous Primus Line liner, 1137 m long
  • Mechanical and hydrodynamic cleaning of the internal surface
  • Milling and CCTV inspection of the gas main
Team

A team combining experience and development

The outcome of an engineering project depends not only on equipment but also on the people who assess conditions, make decisions and carry out the work. We assign specialists according to project requirements, support the exchange of practical experience and encourage professional development.

Initiative, attention to detail and accountability are important parts of teamwork. We expect respect for colleagues, clients and safety rules, while aiming to provide clear working conditions and development opportunities.

Engineer
Equipment operator
Inspection specialist
Project manager
Careers

Careers at DniproRemont

We value specialists who take responsibility for results, work effectively as part of a team, follow safety requirements and continue developing their skills. Specific positions are published in line with current vacancies.