Construction & reconstruction of external utility networks
HDD, relining, pipe bursting, video diagnostics, hydrodynamic cleaning and dewatering — from survey to handover.
Full service cycle for utility networks
Horizontal directional drilling (HDD)
Laying external networks under roads, rivers, railways and dense development without opening the surface. Especially effective in built-up areas — fast, with no damage to landscaping.
Guided auger boring
Trenchless jacking of large-diameter pipes and steel casings with a guided pilot bore and auger spoil removal.
Guided piercing
Trenchless installation of pipes and casings up to DN 350 from a compact launch pit without opening roads or landscaped areas.
Open-cut (trench) method
Classic construction and repair of water and sewer networks from polymer materials with trench excavation — where it is reasonable and cost-effective.
Trench and excavation shoring
Installation of temporary steel panel and bracing systems to support excavation walls and provide a safe underground work area.
Pipe relining (rehabilitation)
Restoring old networks from the inside with polymer liners — without full pipe replacement or major earthworks.
Clear process — from visit to handover
Survey & design
Site visit, tracing, video diagnostics and a technical solution with an estimate.
Preparation
Minimal earthworks, access pit construction and drilling rig installation.
Drilling / laying
HDD or open-cut method, pulling a polymer pipe along the route.
Testing & handover
Pressure testing, quality video check and a full set of as-built documentation.
Modern, technological and responsible
Every year we invest in new high-tech equipment, expand our fleet and upskill our team. Flexible with partners, precise in delivery.
About us
No dig
Minimum damage to paving and landscaping on site.
Years service
Polymer pipes do not rust and last for decades.
Full cycle
From project and materials to turnkey handover.
Guarantee
Documentation, pressure testing and quality control.
Trusted by
We work alongside manufacturers, suppliers, municipal utilities and clients who share our commitment to quality.
Frequently asked questions
How long does the work take?
Timelines depend on the method, pipe diameter and length, and the site conditions. Trenchless drilling (HDD) is usually faster than open-cut. Exact timelines are set after a site survey and once the scope of work is agreed.
Do you provide a guarantee?
Yes. Quality is ensured by proper preparation, the right choice of technology, pressure testing and stage-by-stage control. For completed work we provide as-built documentation and guarantee obligations under the contract.
Which regions do you cover?
We are based in Dnipro and work in Dnipro, the Dnipropetrovsk region and neighbouring regions of Ukraine. Travel to remote sites is arranged by agreement.
Is the site visit and estimate paid?
The initial consultation and a preliminary estimate are free. For an accurate quote we visit the site and, if needed, perform utility locating or CCTV inspection.
What is the maximum pipe diameter?
We install pipes up to 1400 mm in diameter trenchless. Exact parameters depend on the chosen method, the soil and the site conditions.
Trenchless or open-cut — which to choose?
We select the method based on site conditions. HDD minimises excavation under roads, utilities and buildings; open-cut is reasonable on clear sites. We give a recommendation after reviewing the input data.